Just Released: "Slovenia Infrastructure Report 2013"
Fast Market Research recommends "Slovenia Infrastructure Report 2013" from Business Monitor International, now available
| Published on 10 January 2013 |
by Bill Thompson
(WireNews+Co)
Boston, MA
BMI View: Our outlook for the Slovenian construction sector has changed for the worse as we estimate yet another year of contraction in the sector during 2012, despite more than 35% decline in industry value between 2009 and 2011. Tightness in the banking sector and deepening cuts under the spectre of a full bailout will diminish scope for investment in construction projects in the medium term.
Consequentially, we forecast the Slovenian construction industry value to reach EUR2.53bn (US$3.04bn) through the forecast period, growing by a modest average of 2.3% y-o-y (in real terms) between 2014 and 2021.
The cautious growth in the construction industry will mainly be driven by growth in infrastructure subsector as residential and non-residential building segment is likely to remain depressed. The infrastructure accounted for just over 43% of the total construction industry value during 2011, with the transport infrastructure being considerably ahead of energy in terms of value. Transport is set to increase by a real growth rate of 1.85% y-o-y on average between 2013 and 2021, mostly driven by the developments in the port and airport sub-segments. We also expect energy and utilities to grow by a similar magnitude, primarily on the back the government's commitment to a mix of thermal, nuclear and renewable energy development.
View Full Report Details and Table of Contents (http://www.fastmr.com/prod/514034_slovenia_infrastructure_report_2013.aspx)
Following are the key areas of growth in the infrastructure sector:
- Rejuvenating The Transport Sector: The Slovenian port of Koper continues to drive forward its plan to develop into a maritime gateway for Central and Eastern Europe. Port operator International Container Terminal Services Inc (ICTSI) is looking to make the port more attractive to shipping lines, in a project expected cost around EUR15.7mn and be concluded by the end of April 2015. Meanwhile, Aerodrom Ljubljana plans to spend EUR70mn (US$94mn) on constructing a new terminal at its Ljubljana Joze Pucnik Airport in Slovenia. Work is part of a EUR115mn (US$154mn) airport rejuvenation project which will see a new logistics centre open in 2013, with a cargo terminal following in 2015.
- Rushing For New Energy: A new generator at the Sostanj coal-fired power plant and a second reactor at the Krsko Nuclear Power Plant are likely to be the key driver of growth in the Slovenian energy sub-segment in the near future. Slovenia plans to build a new 600 MW unit for the Sostanj lignite power plant (TES6) which would replace the power plant's existing units 1-4 and possibly 5. There are plans to construct a second reactor at Krsko in a project estimated to cost between EUR3.5bn and EUR5bn. Industry participants have however stressed the need for a concrete energy policy without which the development of the energy sector could be hampered.
Fast Market Research is an online aggregator and distributor of market research and business information. Representing the world's top research publishers and analysts, we provide quick and easy access to the best competitive intelligence available. Our unbiased, expert staff will help you find the right research to fit your requirements and your budget. For more information about these or related research reports, please visit our website at http://www.fastmr.com or call us at 1.800.844.8156.
Contacts
- Bill Thompson
- Fast Market Research, Inc.
- PR Contact
- Tel: +14134857001
Posted 2013-01-10 08:05:00














